DAYS |
I 9.30-10.30 |
II 10.30-11.15 |
III 11.15-12.00 |
|
IV 12.15-1.00 |
V1.00-1.45 |
VI 1.45-2.30 |
VII 2.30-3.15 |
|
MON |
|
CPSY 511 (303) |
CPSY 514 Batch A (Lab B) |
B |
CPSY513 (303) |
|
DPSY 511 A/B (Lab A/ C-205) |
DPSY512 A/B (Lab A/ C-205) |
|
TUE |
|
CPSY 511 (303) |
CPSY 514 Batch A (Lab B) |
R |
|
CPSY 514 B (Lab B) |
DPSY 511 A/B (Lab A/ C-205) |
DPSY512 A/B (Lab A/ C-205) |
|
WED |
|
DPSY 511 A/B (Lab A/ C-205) |
CPSY 513 (303) |
E |
CPSY 512 Batch B (C 205) |
CPSY 514 Batch B (C205) |
CPSY 512 Batch A (303) |
||
THU |
|
CPSY 514 Batch A (Lab B) |
CPSY 513 (E 201) |
A |
CPSY 512 Batch B (C 205) |
CPSY 514 Batch B (C 205) |
CPSY 512 Batch A (C 205) |
||
FRI |
|
CPSY 511 (303) |
CPSY 514 Batch B (Lab B) |
K |
CPSY 512 Batch B (C 205) |
DPSY512 A/B (Lab A/ C-205) |
|
CPSY 514 Batch A (Lab B) |
|
SAT |
|
CPSY 511 (303) |
CPSY 513 (303) |
|
DPSY 511 A/B (Lab A/ C 205) |
DPSY512 A/B (Lab A/ C 205)
|
CPSY 512 Batch B (C 205) |
|
Batch A: All-ENG-CND-ENV-ZOL (Only for CPSY 512) |
Batch A:All-ENG-CND-MBL-EVS (Only for CPSY 514) |
Batch B: ENG+CND+ENV+ZOL (Only for CPSY 512) |
Batch B:ENG+CND+EVS+MBL (Only for CPSY 514) |